dingwufangxun

Combined flood control panel

Garage stop flood barrier gate water blocking dam

To build a flood control barrier dam wall, please simply connect the freestanding flood control barriers one by one, and each barrier panel has a buckle structure and a connecting structure.

Send Enquiry

Garage stop flood barrier gate water blocking dam Barrier panels:

1. Light weight and easy to deploy, one person can easily assemble 10 meter long flood barriers  in one minute

2. Our flood barriers could be stacked to save storage space

3. Recyclable materials and has longer life over 10 years

To build a flood control barrier dam wall, please simply connect the freestanding flood control barriers one by one, and each barrier panel has a buckle structure and a connecting structure. Every two partitions form a 3-degree angle when connected, which can create a curved embankment during the construction of the flood control embankment. Normally, one person can splice a 10m wide and 500mm high flood control embankment every minute. However, if the same flood control embankment is built using sandbags, it takes about 5 people 30 minutes. When the flood recedes, remove the flood control barrier panels one by one and let them dry. The characteristic of flood control barrier panels has convenient transportation and storage, without taking too much space. A 1400 * 900mm pallet can put 100pcs temporary flood control panels and build over 60 meters of flood control dams.

It is applied to urban river water backward irrigation, Saltwater intrusion, property garage parking lot, logistics warehouse factory, urban building facilities, rail transit, energy grid, environmental pollution disposal and traffic arteries, etc. It can divert the instantaneous flood, divert the flood that is about to flow into important entrances and exits or areas that need protection to other areas, or delay the flood against some important areas.

Details

Reviews

There are no reviews yet.

Be the first to review “Garage stop flood barrier gate water blocking dam”

Your email address will not be published. Required fields are marked *